A new Campus has inaugurated in Ca ‘Tron which has 10 facilities dedicated to training, the world of startups and businesses, for a total of 30,000 square meters in synergy with the historic H-FARM headquarters.
A project which was started less than a year ago and which involved many subjects including DBA PRO. who had been assigned by Banca Finint to build the site.
A sustainable and self-sufficient Campus from an energy point of view, in osmosis with the territory and the surrounding countryside thanks to buildings of moderate height respecting a widespread architecture. Only 10% of the entire area is built: the remaining space, 27 hectares, is used as an equipped park and wooded area, open to the public. When fully operational, it will host 3,000 people, including 2,000 students, from childhood to university and post-graduate training.
Special thanks to the DBA team who worked in such tight times and made difficult by the pandemic to see the project become a reality.