HV and MV Power Transmission Lines
Cliente: Terna Rete Italia Prysmian E-Distribuzione
Servicios en este proyecto:
- Relieves topográficos
- Progetto esecutivo di linee interrate
- Verifiche geotecniche delle fondazioni unificate
- Investigaciones e informes geológicos
- Piani particellari di esproprio e servitù
For the transmission line project, we provided the final engineering design and managed the permitting process. This started with geological and environmental studies and topographical surveys.
Using our dedicated HV and MV power line design software, we selected the most appropriate support tower solutions based on the stresses induced by the conductors and ground wires.
In special cases, specific assessments are carried out on the towers, resulting in the redesign of some of the most stressed elements.
Electromagnetic fields are checked for compliance with legal thresholds, and grounding systems are also analysed using specific dedicated software to measure the phenomena caused by any interfering infrastructure (oil/gas pipelines).
Póngase en contacto con Nuestro Equipo
Alessandro Bertino
Head of Energy Transmission Business UnitDatos del proyecto
- País
- Italy
- Ubicación
- Italy
- Año
- 2009 - en curso
- Estado del proyecto
- En curso