Port of Civitavecchia: New Oil Terminal in DEGM area

Cliente: SO.DE.CO. S.r.l.

Servicios en este proyecto:
  • Diseño preliminar

Project for the construction of a new wharf for 100,000 DWT tankers for the loading-unloading of jet-fuel, diesel, petrol, fuel oil and bitumen, as well as for bunkering. Analysis of the possibility of adding an approach for ships to LNG. The project includes the following interventions:

  • Survey of the current state;
  • Interference analysis;
  • Analysis of existing plants and necessary maintenance interventions;
  • Study of a new protected wharf for loading and unloading of petroleum products;
  • Solutions for overcoming interference;
  • Investment analysis;
  • Cost-benefit analysis.

 

Otros proyectos relacionados con esta área